# How to Prepare a Subfloor Before Flooring Installation

Category: Installation · URL: https://meistertenerife.com/en/resources/guides/installation/how-to-prepare-a-subfloor

Flatness, moisture, cleanliness, stability and height: the checklist worth resolving before the flooring arrives.

**Installation does not start with the first plank. It starts when you decide whether the subfloor is really ready to receive it.**

## 1. Identify what is underneath

A new slab, an old screed, wood, tiles or an existing floor covering are not the same. The type of subfloor determines which checks, barriers and preparation may be needed.

## 2. Check the moisture

Subfloor moisture cannot be judged by touch. On new builds and mineral subfloors, the values and measurement procedures set for the product and system must be followed. If there is a risk of moisture coming from the subfloor, resolve it before installing.

## 3. Check the flatness

A click joint is not designed to correct an uneven floor. Unevenness outside tolerance must be corrected with the appropriate procedure before laying. An underlay should not be used as a substitute for necessary levelling either.

## 4. Clean and stabilise

Dust, building debris, loose pieces or areas that give way compromise the installation. The subfloor must be clean and sufficiently stable. Also check for cracks or movement that need prior treatment.

> **Before ordering the flooring**
>
> Also measure door heights, junctions with other floor coverings, stairs, fixed furniture and skirting boards. The best technical solution can change if you only have a few millimetres.

## 5. Decide on barrier and underlay

Once the subfloor is known and the flooring chosen, define the complete lower solution: moisture protection where applicable, a compatible underlay and thermal/acoustic requirements.

## 6. Plan joints and transitions

Doors, large surfaces, changes of material and building elements must be resolved before starting. [Profiles and trims](https://meistertenerife.com/en/products) are not a final fix: they are part of the technical design.

## When is it worth asking for help?

If there is moisture, significant unevenness, an old refurbishment, underfloor heating or doubts about the subfloor, a prior check can save far more than trying to fix the problem afterwards.

- [Underlays, profiles and installation](https://meistertenerife.com/en/products)
- [Review my project](https://meistertenerife.com/en/quick-quote)

> **What to provide so we can assess the preparation in Tenerife**
>
> Share your municipality, area, existing floor covering, photographs and signs of moisture. The inspection must confirm flatness, stability, moisture and junctions; photographs give guidance but do not replace checks on the subfloor. Ask for any preparatory work to be itemised before accepting the proposal.
>
> - [Review underlays and trims](https://meistertenerife.com/en/products)
